Building the Future: A Timeline of MAS's Projects.

We specialize in high-quality construction services, from design-build to general contracting. Let us bring your vision to life.

Ready to build?

Coming Soon 2027 - Luxury Apartments, Chigwell — 9 Units (Coming 2027)

Introducing an exclusive collection of nine newly built, luxury two-bedroom apartments perfectly situated in the heart of Chigwell.
For more details or to register your interest, please contact us.

    Due 2027 - 11,000 sq ft Community Centre, East Ham

    A modern, environmentally conscious 11,000 sq ft community centre located in the heart of East Ham, offering five floors of versatile space, a newly developed basement level, and a cutting edge blue-green roof that supports rainwater management, biodiversity, and long-term sustainability.

      Completion 2026 - Complete Shop Renovation and Flat Conversion

      This project involved a full renovation of a working tailoring shop in Bounds Green, followed by the conversion of the upper floors into a spacious split-level flat. Works included a loft conversion, dormer, loft extension, and side extension. The phased approach kept the shop open throughout, minimising disruption to the business. The flat spans two floors with high quality finishes throughout

        2025 - Insurance Reinstatement, Structural Repair After Vehicle Impact

        This property suffered significant damage after a car collided with the front of the house. The entire project was managed through the client’s insurance provider, and our team handled everything from structural repairs to final finishing.
        The result? A reinstatement completed to an exceptional standard, leaving the home looking even better than it did before the incident. We are fully experienced in delivering high quality insurance reinstatement works to full restoration.

          2024 - New Build Community Centre over 5000 sq ft


            2024

            This project involved a comprehensive refurbishment and structural redesign of the entire house. Our team installed a completely new internal structure and lowered the ground-floor and first-floor levels to create increased ceiling heights throughout, from the ground floor to the second floor.
            Works included a 6m rear ground-floor extension, a 3m first-floor extension, a full loft conversion, high-performance external wall insulation, and the construction of a bespoke garden outhouse.

              2024 - 3,000 sq ft Bespoke Detached New Build, Brentwood

              A beautifully crafted, brand-new 3,000 sq ft detached house in Brentwood. This stunning home combines modern design with high-quality materials, offering light-filled open-plan living spaces, generous bedroom suites, and exceptional craftsmanship throughout.

                2022 - 40-Apartment Residential Development with Basement Car Park, Romford

                A landmark development in Romford featuring two purpose-built residential blocks: a main block of 32 apartments and a second block of 8 units. The project includes an expansive 8,000+ sq ft basement car park and a total build area of over 40,000 sq ft.
                Our scope also covered a newly formed private road, a dedicated substation, and comprehensive landscaping, making this a true flagship project for our portfolio.

                  2019 - Mixed-Use New Build with Basement, 245 Mile End Road

                  245 Mile End Road is a contemporary new build scheme featuring three well designed apartments, a versatile commercial unit, and a newly built basement. Delivering high quality urban living and mixed use functionality in a prime location.

                    2018 - Groundworks For A Refuse Centre, Whipps Cross Hospital

                    We carried out the full groundworks for the new refuse centre at Whipps Cross Hospital, delivering all excavation, foundations, drainage infrastructure, and site preparation to support the hospital’s upgraded facilities.

                    2018 - 8-Apartment New Build with Basement, Whitehorse Road, East London

                    160–162 Whitehorse Road, London E1, is a bespoke new-build scheme featuring eight well-designed apartments and a newly constructed basement, delivering high-quality living space in a prime East London location.

                      2017 - Community Centre Renovation with Basement & Loft, Ripple Road

                      A modern community centre at 343 Ripple Road, delivered with a new basement, a full loft conversion, and a comprehensive internal renovation, transforming the building into a highly functional and contemporary community space.

                        2016 - 10,000 sq ft Basement & RC Frame, Noor Ul Islam, Leyton

                        Noor Ul Islam. 711–715 High Road, Leyton. This project involved delivering a 10,000+ sq ft basement integrated with a reinforced concrete frame, supporting a wider development of more than 35,000 sq ft spread over four floors.

                          2016 - Rear Extension & Change of Use to Residential, Mile End Road

                          247 Mile End Road: This project involved the erection of a two-storey rear extension and a full change of use to form two modern one bedroom flats, with the existing ground floor commercial space retained and kept operational throughout.

                          2015 - Mansard Extension & Conversion to 4 Flats, Walworth Road

                          281 Walworth Road: This project involved the erection of a mansard roof extension to the existing outbuilding on Walworth Place and the construction of a new three-storey staircase hall to the rear of the main building. These structural additions supported the full conversion of the upper floors into four residential units, comprising one three bedroom flat and three one bedroom flats. With dedicated amenity areas, secure cycle storage, and bin store facilities.

                          2014 - Mansard Extension & 3 New Residential Units, Bethnal Green Road

                          272 Bethnal Green Road: This scheme involved the erection of a fourth floor mansard roof along the Bethnal Green Road frontage and the construction of two new storeys at the rear, creating a three storey building fronting Voss Street. These works enabled the formation of three new residential units. One two bedroom flat and two one bedroom flats. Alongside a newly built basement and the installation of a new ground floor entrance door to the front elevation.

                          2013 - 3,500 sq ft Basement Groundworks, Raven Row

                          At 49–51 Raven Row, we completed all groundworks and constructed a substantial 3,500+ sq ft basement, forming the foundation for the wider development.

                          2012 - Façade Retention Redevelopment — 3 Flats & Basement, Brick Lane

                          At 188 Brick Lane, we delivered a façade retention redevelopment, demolishing the existing structure behind the original frontage and constructing three new flats, modern commercial units, and a new basement, blending contemporary build quality with the character of Brick Lane.

                            Next

                            Copyright © 2026 MAS Construction - All Rights Reserved.

                            Company Reg. No. 15462402

                            This website uses cookies.

                            We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

                            DeclineAccept